Orderbook analysis
Tankers are the busiest segment
Tankers make up 55 of the 100 ships (17 orders), ahead of bulk carriers (27 ships) and container ships (18). They range from 28,000 DWT stainless-steel chemical tankers to VLCCs — 13 VLCCs across five orders. Where a price was reported, VLCCs came in at USD 108–133.5 million per ship.
China builds most of it
71 of the 100 ships go to Chinese yards, 12 to South Korea and 6 to Japan; the yard for the other 11 was not disclosed. Hengli Heavy Industry alone appears in five orders. For owners, that concentration is a reason to look hard at yard capacity and supervision resources before signing.
Alternative fuels are rarely named
Only 2 of the 28 orders state an alternative-fuel capability: six 13,650 TEU LNG dual-fuel container ships for Yang Ming at Hanwha Ocean, and two methanol-ready MR tankers for Leonhardt & Blumberg. Most reports do not mention fuel, so this undercounts. Ships delivering in 2028–2030 will still trade through the FuelEU steps of 2030 (−6%) and 2035 (−14.5%) and face the full EU ETS from their first year — fuel flexibility belongs in the specification.
Product tankers and VLCCs make up the tanker count
Of the 55 tankers, 18 are MR-size product or chemical tankers (around 50,000 DWT), 12 are LR2s (about 115,000 DWT), 13 are VLCCs, 10 are stainless-steel chemical tankers of 28,000–40,000 DWT, and 2 are Suezmax options at Hengli.
Bulk carriers: Ultramax and Kamsarmax
The 27 bulk carriers split into 12 Ultramaxes, 11 Kamsarmaxes and 4 Newcastlemaxes of 210,000 DWT at New Times Shipbuilding — all at Chinese yards.
Containers: big ships in Korea, feeders in China
Of the 18 container ships, the eight largest (13,650–14,000 TEU) are split between Hanwha Ocean and Hudong-Zhonghua. The rest are 3,000–3,100 TEU feeders at Chinese yards and four midsize ships at Imabari in Japan.
Delivery slots run to 2030
Where a delivery date was reported, most ships deliver between 2028 and 2030; the earliest are four VLCCs at Hengli due from May 2027. For 43 of the 100 ships no delivery date was given. Owners ordering now should expect slots in 2029 or later at the busiest yards.
Firm orders and reports
14 of the 28 orders (55 ships) are reported as firm, 13 (43 ships) are reported without confirmation, and one is an option for 2 ships. We count them all, but treat the unconfirmed reports with care.